Saturday, September 14, 2019

2019 Pooches and Pints: Barktoberfest


Sponsored by: Golrusk Pet Care Center, Gentle Vet Animal Hospital, and the Animal Referral Center Fox Valley & Green Bay
Date: Saturday, October 12
Time: 12pm-4pm
Location: Green Isle Park
Come out and bring the whole family, even those furry four legged members, for an afternoon at the park at our annual Pooches and Pints Barktoberfest event.

Sponsored by Golrusk Pet Care Center, Gentle Vet Animal Hospital, and the Animal Referral Center Fox Valley & Green Bay, in partnership with Lucky 7 Dog Rescue, Laura & Peter Mossakowski Family Dog Park, and hosted by the Village of Allouez.

Don’t forget to bring these items with you, along with your dog!
* Human I.D. (for adult human beverages)
* Dog leash (for outside of the fenced area)
* Towels (we have small pools)
* Clean-up bags (for our four-legged messes)
* Cash (for food, drinks, and raffles)

This event will include:
- Pop-Up Dog Park, where your pooches can run off leash at the park in a designated fenced in area
- Pet Vendors
- Live Music
- Food Trucks (Five Pepper Market & Wharf and Marrow)
- Beer/Soda Tent
- Pet Costume Contests
- and so much more!!  


2019 Street Reconstruction – Project Schedule


The construction season has begun in The Village of Allouez on some or all of the streets listed below:
1. Longview Ave. –Delahaut St. to Libal St.
2. Oakwood Ave. – Greene Ave. to Allouez Ave.
3. Oak Hill Dr. – Beaumont St. to Oakwood Ave.
4. Summit St. – Beaumont St. to Oakwood Ave.
5. Martha Ave. – Dead End south 60 feet (New Construction)
6. St. Joseph St. – Riverside Dr. to Webster Ave.

7. Brookridge St. – Libal St. to Dauphin St.
8. Beaupre St. – Libal St. to Webster Ave.
9. Warren Court – Riverside Dr. to Du Charme Ln.
This reconstruction project includes:
– Replacement of the existing water main, sanitary and storm sewer where necessary.
– Removal and replacement of existing water, sanitary and storm sewer laterals to the property line.
– Placement of new concrete curb & gutter and driveway aprons. The existing driveway width at the property line will be matched.
– Removal and replacement of the asphalt pavement.
– Installation of new sidewalk on Longview Ave (north side only) and St. Joseph St. (both sides).
– Voluntary replacement of private side sanitary sewer lateral.
Longview Ave. – Delahaut St. to Libal St.
Weather permitting the anticipated project schedule is as follows:
• Work Started – June 24

• Substantial Completion Date – End of August/Early September
Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction.
-Final layer of asphalt is next on the schedule and should be completed this week.
Martha Ave. – Dead End south 60 feet (New Construction)
• Work Started – May 13th

• Substantial Completion Date – Mid-September


Project Status:
-Paving and landscaping is next on the schedule.
St. Joseph St. – Riverside Dr. to Webster Ave.
Weather permitting the anticipated project schedule is as follows:
• Work Started– May 20th
• Substantial Completion Date – Middle of September
Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction.
-The installation of street signs is next on the schedule.
Oakwood Ave. – Greene Ave. to Mission Road
Weather permitting the anticipated project schedule is as follows:
• Work Started June 24

• Substantial Completion Date – Middle to end of October
Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction. Temporary mailboxes are set up for use.
-Road excavation is scheduled to begin the week of September 3 with curb & gutter to follow.
Oakwood Ave. –Mission Road to Allouez Ave.
Weather permitting the anticipated project schedule is as follows:
• Work Started– Sept 3
• Substantial Completion Date – Middle to end of October
Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction. Temporary mailboxes are set up for use.

-The contractor to begin with the installing of new water main at the Mission Road intersection. Sanitary sewer main line to follow.
Oak Hill Dr. – Beaumont St. to Oakwood Ave.
Weather permitting the anticipated project schedule is as follows:
• Work started Aug 12
• Substantial Completion Date – Middle to end of October

Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction.
-Private side sanitary sewer laterals to be installed the week of September 9 with street excavation to follow.
Summit St. – Beaumont St. to Oakwood Ave.
Weather permitting the anticipated project schedule is as follows:
• Work Started Aug 28
• Substantial Completion Date – Middle to end of October

Project Status:
-Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction.
-The contractor to continue working on the installation of sanitary sewer main. Water services and sanitary sewer laterals to follow.


Brookridge St. – Libal St. to Dauphin St.
Weather permitting the anticipated project schedule is as follows:
• Work started 8/19/19
• Substantial Completion Date – End of August/Early September
Project Status:
Street closed to thru traffic. Roadway (one lane) will be open for emergency purposes, businesses and residents during construction.
Final layer of asphalt and landscaping is next. Paving will be scheduled around the drop-off and pick up of students.
Beaupre St. – Libal St. to Webster Ave.
Weather permitting the anticipated project schedule is as follows:
• Work to Begin – Approximately 9/16/19
• Substantial Completion Date – Middle to end of October
Project Status:
Work has not started.

Warren Court – Riverside Dr. to Du Charme Ln.
Weather permitting the anticipated project schedule is as follows:
• Work to Begin – Approximately 9/16/19
• Substantial Completion Date – Middle to end of October
Project Status:
Work has not started.

Scheduled Brush Pick-up: September 16-19th

Brush will be collected at the curb the week of September 16th on your garbage day or can be brought to the LeBrun Yard Waste Site during their open hours. 
Brush should be placed at the curb by 6:00 a.m. on your garbage collection day or the night before.
– Brush piles must not exceed 8’ in length and/or 6’ in depth
– Brush must be parallel to the curb (not in the street)
– Brush must be 4’ away from any structure (mailbox, trees, cars, etc.)
– Brush cannot be commingled with loose leaves, grass or garden waste.
Brush is hauled to the Le Brun Yard Waste Site where it is chipped for use in Village playgrounds and tree planting. The chips are also made available to our residents. In order to do this, only “clean” brush that does not contain loose leaves, grass or garden waste can be used. Co-mingled brush needs to be disposed of resulting in additional hauling and disposal fees. The correct placement of the brush allows for an efficient and safe collection process. Your help in making this process work smoothly is greatly appreciated!
Correct Brush placement:

Tuesday, September 10, 2019

2019 Fall Art Exibit


The 2019 Fall Art Exhibit is ready for viewing in the boardroom at the Allouez Village Hall. You are welcome to stop by to see the watercolor creations of our Allouez Community Center painters. This display will be available until December. We invite you to be amazed at the artistic talents that we have right here in Allouez!

Monday, September 9, 2019

Allouez Employment Openings

The Village of Allouez is looking for responsible and dedicated people for various employment opportunities within Allouez. Open positions are listed below. More information on each opening can be found by clicking the job description link.
If interested in any of these positions please complete an Allouez Employment Application

Seasonal/Temporary Positions

  • Allouez Youth Dance Instructor
    • Applications accepted until position is filled
    • Dance Instructor Job Description
    • Position Notes:
      • Pay: $13/HR
      • Tuesdays & Thursday Nights
      • Dance Experience Required