Wednesday, September 15, 2021

Brush Pick-Up: September 20th-23rd

               


Brush will be collected the week of September 20th-23rd (on your garbage day)

Brush is defined as trimmings from shrubs, trees, and stalks from garden plants (e.g., rosebush and bamboo). "Brush" does not include tree roots or root balls. Brush schedule can be found here- http://www.villageofallouez.com/wp-content/uploads/2021/03/2021-Bulk-Brush.pdf

Brush must be placed at the curb by 6:00 a.m. on your garbage collection day or the night before.

– Brush stacks must not exceed 8’ in length and/or 6’ in depth
– Brush must be in stacks and aligned parallel to the curb (not in the street)
– Brush must be 4’ away from any structure (mailbox, trees, cars, etc.)
– Brush cannot be commingled with loose leaves, grass or garden waste.  Brush comingled with yard waste WILL NOT be picked up. 

DO NOT obstruct the street, gutter or sidewalk and DO NOT place adjacent to power poles or hydrants.

In areas where sidewalk is adjacent to the curb, brush shall be placed behind the sidewalk in stacks aligned parallel to the sidewalk, in such a manner as to not interfere with pedestrian use of the sidewalk.

Brush cut by contractors will not be collected by the Village.

Brush can also be brought to the LeBrun Yard Waste Site located on Le Brun Street (take East River Drive south towards De Pere.  Le Brun Street is the last street in Allouez.  Turn left (east) onto Le Brun Street and follow it to the gate.).  Yard Waste Site is open 24/7.  
            
NOTE:  The Village hauls the brush to the Le Brun Yard Waste Site (Open 24/7) where it is chipped for use in Village playgrounds and tree planting. The chips are also made available to our residents.  In order to do this, only “clean” brush that does not contain loose leaves, grass or garden waste can be used.  Co-mingled brush needs to be disposed of resulting in additional hauling and disposal fees.  The correct placement of the brush allows for an efficient and safe collection process.  Your help in making this process work smoothly is greatly appreciated!

Correct Brush placement:



Village of Allouez Photos Needed

 


Do you have a favorite photo of Allouez you would like to share with us?

Village of Allouez is looking for any photos taken in the Village of Allouez to use in our 2022 All About Allouez Guide. These pictures can be anything from Allouez parks to great nature scenes in the Village. One picture will be chosen to be on the cover our 2022 guide.

Submit your photo as an email attachment to recreation@villageofallouez.com
Be sure to include your name in the email, so we can give proper credit.

Libal Street Improvement Project

Public meeting for Libal Street Improvement Project in Allouez

Meeting to focus on introducing the proposed project and listening to comments, concerns, or suggestions.

The Village of Allouez is conducting a public involvement meeting to discuss proposed improvements for the reconstruction of Libal Street between Wisconsin Highway (WIS) 172 and Kalb Avenue.

The meeting is scheduled for Wednesday, September 22, 2021, from 5:30 P.M. to 7:30 P.M., in the Village Hall Board Room, 1900 Libal Street, Allouez. The objective of this meeting is to introduce the proposed project and listen to comments, concerns, or suggestions.

The proposed project will reconstruct Libal Street from WIS 172 to Allouez Avenue and replace the existing pavement from Allouez Avenue to Kalb Avenue. The preliminary design of the reconstruction section from WIS 172 to Allouez Avenue will investigate options for roadway widths, bike lanes, parking, and sidewalks. New storm sewer will be constructed in this section. New sidewalk is proposed between Greene Avenue and Allouez Avenue on the west side of Libal Street. The pavement replacement section from Allouez Avenue to Kalb Avenue will construct a new asphalt pavement while maintaining the existing curb and gutter and existing sidewalk. Existing curb and gutter and sidewalk in poor condition will be replaced as necessary. New sidewalk is proposed north of Beaupre Street to Kalb Avenue on the east side of Libal Street. The existing storm sewer will be reviewed and spot repairs completed as necessary. The project is anticipated to begin construction as early as 2024.

Adjacent property owners are encouraged to attend the meeting. Citizens who are deaf or hard of hearing and require an interpreter may request one by contacting Sean Gehin at least three working days prior to the meeting.

In the coming weeks please visit https://www.villageofallouez.com/libal street improvement project/ for project information, including displays that will be shown at the public involvement meeting. Also, we encourage you to share this information with others that may be affected or have an interest in this project.

For more information, contact:
Sean Gehin, Village of Allouez Director of Public Works
920.448.2802

Tuesday, September 14, 2021

2021 Construction Projects - Project Update 9/13/2021

 


2021 Construction Projects - Project Update 9/13/21

2021 Fire Safety Poster Contest

 

Attention Students, Parents & Teachers! 

The Green Bay Metro Fire Department is sponsoring a fire safety poster contest. This contest is open for 1st, 2nd, 3rd, 4th, & 5th grade students. Posters are to be related to this year's fire prevention theme: "Learn the Sounds of Fire Safety!"

All posters need to be submitted to a GBMFD Fire Station by Friday, October 15th. Please print the following on the back of all posters:

  • Students Full Name
  • Parent or Guardian's Name
  • Telephone Number
  • Address
  • School the Student Attends
  • Grade Level

Rules of Participation

  1. Participants must be in 1st, 2nd, 3rd, 4th or 5th grade.
  2. Posters should be created on white construction paper.
  3. Each poster must clearly state the fire prevention theme.
  4. Participants MUST live within the City of Green Bay, Village of Allouez, or Village of Bellevue limits. 

Poster Drop-Off Locations

  • Station 1 (501 South Washington Street)
  • Station 2 (929 University Avenue)
  • Station 3 (885 Shawano Avenue)
  • Station 4 (2650 West Point Road)
  • Station 5 (2310 Finger Road)
  • Station 6 (1701 West Mason Street)
  • Station 7 (3489 Humboldt Road)
  • Station 8 (135 Dauphin Street, Village of Allouez)
  • Station 9 (3100 Eaton Road, Village of Bellevue)

Winners will be notified by the end of the day on October 18th, 2021. A winner will be chosen from each grade. 


Saturday, September 11, 2021

2021 Fall Youth Dance Classes

 


Description: Students will learn skills, poses, and technique of tap, ballet and jazz  disciplines and apply what is learned into fun routines. Classes begin with ballet and shoes change mid-way through.
Fee:  $50 Allouez Residents/ $63 Non-Allouez Residents
*Bellevue residents may register for resident rate. Please contact Village of Allouez (920-448-2804) for more information. 
Dates: Thursdays, September 30-December 9
*No Class November 25. 
Location: Green Isle Park Pavilion (900 Greene Ave, Building A.)
Ages: 3-11 years old
Classes:
  •  Tiny Tap, Jazz, and Ballet:
    • Ages: 3-4 years old
    • Time: 5:15pm-6pm
  •  5-6 Year Old Tap, Jazz, and Ballet:
    • Ages: 5-6 years old
    • Time: 6:15pm-7pm
  •  7-12 Year Old Tap, Jazz, and Ballet:
    • Ages: 7-12 years old
    • Time: 7:15pm-8pm
Register:
  • Online at: https://allouez.recdesk.com/Community/Program?category=3
  • In person at Allouez Village Hall (1900 Libal St.)

Friday, September 10, 2021

Thank you to our 2021 Movie in the Park Sponsors

 

Thank you to all our 2021 Movie in the Park sponsors.
Without all of you these events could not take place.
 
Thank you to all who attended out Movie in the Park events this summer and we hope to see you all back next summer.
 
Stay tuned to our Village Facebook for updates on 2022 Movie dates and titles.