This project is located on East River
Drive between Hoffman Road and Lebrun Street and along Longview Avenue between
East River Drive and Doty Elementary School. The project proposes to install
sidewalk along the north side of Longview Avenue and the west side of East
River Drive and is scheduled for construction in 2022.
Specific information about the
proposed improvements, traffic impacts, and project schedule are available for
review at the following link:
https://ws.onehub.com/folders/isbnu1gz
Feedback from the public is
encouraged. Instructions on how to provide questions, comments, and concerns
are included in the linked documents. Representatives from the Village of
Allouez and the design team will review and address any questions or concerns
submitted.
If you are unable to access the information provided in the link above or would like more information, contact design consultant Rich Glen at (920) 468-4771. Written comments regarding the project can be mailed to Rich Glen, JT Engineering, 1077 Centennial Centre Blvd, Hobart, WI 54155 or emailed to richg@jt-engineering.com.