Sunday, September 13, 2020

2021 All About Allouez Cover Photo Contest

Looking for photos of Allouez

Do you have a favorite photo of Allouez you want featured on the cover of the 2021 All About Allouez booklet?

Photos must be sent as an email attachment to recreation@villageofallouez.com.

Please include the name of the photographer. All photos must be submitted by Friday, October 9th.


2020 Cover Photo Winner



Friday, September 11, 2020

Allouez Beautification Commitee Looking for New Members

Calling all Allouez residents…

The Allouez Beautification Committee is looking for new members and volunteers.

Our meetings are at 6:30pm at Green Isle Park Pavilion.

Our fall meeting dates are:

  •  Tuesday, October 20th
  • Tuesday, November 17th

We are always looking for fresh ideas for the 2021 and future growing seasons.

For more information call:

Wendy Sutter 920-412-0716 or

Marlene Sharman 920-217-6047

Thursday, September 10, 2020

Kiwanis Park Pickleball Courts Now Open


The Village of Allouez is excited to announce that the brand new pickleball courts at Kiwanis Park are now completed and available for use. This project was funded in part by a grant from the Green Bay Packers Foundation.

The courts are open to the public on a first come first serve basis from 6am-10pm.


Tuesday, September 8, 2020

Kayak Launch Install at Optimist Kayaker's Point & Green Isle Park






The Village is excited to announce the completed installation of our new kayak launch at Optimist Kayakers Point (located at 415 W. Lazarre Ave.) and Green Isle Park (900 Greene Ave.)
The Village would like to thank the State of Wisconsin Coastal Management Grant program and the Fox River/Green Bay Natural Resources Trustee Council NRDA program for funding this project. 

Monday, September 7, 2020

Village Hall Seasonal Office Hours


Beginning April 6th-October 30th, 
Allouez Village Hall will be open:

Monday – Thursday 7:00 a.m. – 4:30 p.m.
Friday 7:00 a.m. – 11:00 a.m.


Friday, August 14, 2020

August Movie in the Park & Fall Barktoberfest Cancelled

Due to the ongoing concerns over the COVID virus,  Village of Allouez has decided to cancel our upcoming August 14 Movie in the Park and Fall Barktoberfest Events. We apologize for any inconvenience this may cause.

Stay safe and we hope next year will allow us to run these great community events.



2020 Allouez Arts & Crafts Hour



This program is great for any child who loves to be creative, craft, learn new things, and just have fun. Each week our instructor will walk participants through a new craft project or skill they can take home with them.

Classes will be held at Green Isle Park pavilion. When possible classes will be outside, to help with spacing and air flow. When inside participants will be socially distanced and required to wear masks.
 
WHEN: WEDNESDAYS
WHERE: GREEN ISLE PARK PAVILION (900 GREENE AVE.)
TIME: 5:00PM-6:00PM
DATES: SEPTEMBER 16-OCTOBER 21
AGE:7-13
COST: $33 R/ $41 NR
*Price includes all craft supplies. 

Classes:
September 16: Star & Heart Prints: Create stamps from foam to make cool painted designs.
September 23: Friendship Bracelet Making & Beading: Learn to make different types of friendship bracelets. 
September 30: Animal Canvas Painting: Sketch out a fun animal design and use paint to create a masterpiece.
October 7: Q-Tip Painting: Use Q-Tips to make a dotted piece of art.
October 14: Sharpie Tie Dye: Use sharpies to create a fun tie dye design.
October 21: Paint a Pumpkin: Using paint to create a fun design, drawing, or face on your pumpkin.


Thursday, August 13, 2020

2020 Reconstruction Project Update


2020 Street Reconstruction – Project Schedule
July 7, 2020
This 2020 construction season has begun in The Village of Allouez on some or all of the streets listed below:
1. St Mary’s Boulevard -- Riverside Dr to  ± 1500 feet to east (#310/#311)
2. Stanton Court/Arbor Lane --  Stanton Ct to Rosemont Dr (near Webster Ave)
3. Garland Street – Webster Ave to Baird St
4. Allouez Terrace Alley – Riverside Dr to end.
5. East St Joseph Alley - behind Associated Bank
6. Olde River Condominium Trail
7. Longview Pond Trail Repair
8. Bethel Pond Project
9. Standpipe (Water Tower) Repair Project
These street improvements include:
- Removal and replacement of the asphalt pavement.
- Replacement of defective gravel base
- Replacement of defective concrete curb & gutter and driveway aprons
- Manhole & catch basin repairs

- Sanitary sewer repairs on St Mary’s Blvd

1. St Mary’s Boulevard – Riverside Dr to ± 1500 feet to east (#310/#311)
Weather permitting the anticipated project schedule is as follows:
• Work started – May 7
• Substantial Completion Date – Beginning of June (paving only/sanitary work will continue)
Project Status:
Initial paving completed (6-2-20) proposed sewer work schedule is as follows:  sanitary sewer main lining to be completed by September 4.  Sanitary sewer lateral replacements project to begin August 31 and be completed by October 2.  Final paving and turf restoration to be completed by October 30, 2020.  


2. Stanton Court/Arbor Lane -- Stanton Ct to Rosemont Dr (near Webster Ave)
Weather permitting the anticipated project schedule is as follows:
• Work started – May 13
• Worked completed – June 26
Project Status:
Paving completed; contractor & village to monitor the progress of the restored landscaping.


3. Garland Street – Webster Ave to Baird St
Weather permitting the anticipated project schedule is as follows:
• Work started – May 28
• Worked completed – June 26
Project Status:
Paving completed; contractor & village to monitor the progress of the restored landscaping.


4. Allouez Terrace Alley – Riverside Dr to end.
Weather permitting the anticipated project schedule is as follows:
• Work started  – May 14
• Worked completed – June 16
Project Status:
Paving completed contractor will return to install gravel shoulder.


5. East St Joseph Alley behind Associated Bank
Weather permitting the anticipated project schedule is as follows:
• Work started – May 14 (asphalt removal)
• Worked completed – June 16
Project Status:
Paving completed.


6. Olde River Condominium Trail
Weather permitting the anticipated project schedule is as follows:
• Work to Begin as weather permits
• Worked completed – June 16
Project Status:
Paving & shouldering completed contractor will return for turf restoration.


7. Longview Pond Trail Repair
• Worked completed – June 15


8. Bethel Pond Project
Beginning in July the Village will be constructing a 1-acre regional stormwater pond located east of the Bethel Baptist Church on the southside of Kalb Street.  In conjunction with the project, the Village will be installing 1350 ft of 48” Storm Sewer along the south southside of Kalb Street from Irwin Avenue  east to the pond.
The anticipated project schedule is as follows:
• Work to Begin – End of July
• Substantial Completion Date – September 25th, 2020
The Village will be constructing a 1-acre regional stormwater pond located east of the Bethel Baptist Church on the south side of Kalb Street.  In conjunction with the project, the Village will be installing 1350 ft of 48” Storm Sewer along the south southside of Kalb Street from Irwin Avenue  east to the pond.
Project Status:
Work has started with the removal of trees and the installation of erosion control measures.  Next on the schedule will be the construction of the pond (2-3 weeks) with storm sewer main to follow. 

9. Standpipe (Water Tower) Repair Project
Minor structural repairs to the Water Tower are anticipated to begin on the 13th of July.  In general the interior and exterior repairs consist of replacement of the overflow weir box, exterior power washing, touch-up painting, improvements to the fall protection equipment, and upgrading at grade overflow pipe. 

The anticipated project schedule is as follows:
• Work Started Mid - July
• Worked Completed – August 6
Project Status:
Work has been completed and we are back to normal operations.